Sunday, April 7, 2013

4/7/13

4/7 - Finished assembling both front and back walls. Kristin cut studs for the upper floor knee-wall. Me, Kristin, Mom and Dad all flipped over the subfloor framing. I toe-screwed each joist to the skids with two long screws running from opposite sides of the joist. Tomorrow will be completion of the subfloor and raising the first floor walls.

No comments: